Projects

9 Smeaton Close, Aceville Media

Design requirements: to convert a 2000 square foot warehouse into a year round usable photo studio, for live and still modelling.  The key criteria was for staff and models to be comfortable without equipment having visual impact.

Albian Gardens

Home office Fujitsu wall mounted LMCE heat pump - this was to provide comfort cooling to make a compact office usable year round without considerable expense. This was installed in a day without fuss and mess  and without disruption to business activities.

Belstead Brook Hotel, Ipswich, Suffolk

Design requirements: to provide an affordable solution to heat issues within their wedding suite during extremes of weather. We provided two large Fujitsu heat pump systems to ensure good even temperature control; the first Fujitsu four way cassette above the bar and seating area and the second system, for dance floor and stage. The installation was undertaken over two days and ensures the facility is fit for purpose and meets clients expectations all year round.

Chelmsford Railway Station

Ticket office and waiting room - Air Source heat pump air conditioning solution was provided to a leading Railtrack infrastructure provider. We were asked to fit around and work along side other trades to ensure deadlines and tender requirements were met.

Colchester Travel

Design requirements: to make first floor offices and ground floor sale area comfortable retrospectively without causing disruption or damage to recent refurbishment of the building - two Split Fujitsu ASYG wall mounted units were installed. All pipes and cables were hidden from view, leaving a tidy  and clean finish.

Dale Rudd

Mitsubishi Electric High wall ZEN air conditioning heating and cooling systems installed within pent house apartment in North Station, Colchester. The systems were chosen and installed to provide an alternative to electric under floor heating. The project consisted of three systems carefully installed to make use of voids and locations, so only the desired parts are seen. The project was very successful and reduced clients electric costs by sixty percent.

Doucecroft

Design requirements:  to provide a simple, cost effective solution to first floor therapy suites to allow Autism Anglia to provide their service users treatments in a temperature controlled environment. The systems compensate for the vaulted ceiling and large glass elevations, and are optimised to ensure they are only cooled or heated when required via smart controllers -allowing clients to meet their green goals.

Friern Barnet School

Design requirements: provide air conditioning within Information Technology classrooms and main school IT server during half term shut down, without children having access to equipment or condensing units once installed to ensure safety. Climate provided several systems all installed without the need for specialist access equipment promptly, each system was installed and mounted using our in house specialist equipment by our trained engineers without fuss or hassles despite being on second and third floors.

George Mitchell Nursery

Climate was tasked with providing two turn-key compact cassette Mitsubishi electric branch split systems, to be mounted within porta cabin style temporary building. Each system providing a year round heating and cooling facility, the systems were installed in two site days and fit neatly within the building fabric.

GFM Holdings

As with many of our call centre clients we have a lot of experience ensuring these types of locations remain productive and environment doesn’t become detrimental to working productively. We installed various high wall, compact and full size ceiling Mitsubishi heavy systems over many years. All operate with minimal maintenance which reduces on going costs, our client has continued to remain with us for over a decade due to our commitment to serving our customers.

Nissan Sunderland

Requested to help provide a practical solution to new engine production management suite when it was discovered many operations were going to be effected by heat. After careful consideration of the requirements Climate were able to install single split systems within each measuring and calibration office, to ensure Nissan met their quality control requirements. This was undertaken during working hours, fitting in and around their production successfully.

Little Green Self Storage, Elmstead Market, Colchester.

We were contacted by the manager of this facility after he become frustrated trying to find a practical and sensibly priced comfort cooling solution for each of his clients renting office spaces. We promptly identified single split systems were needed and opted for the Fujitsu LMCE 3.5kW range. This allowed us to provide each location independent control for their own spaces; allowing our client to proportion energy costs in addition. This project has been a great success allowing our client to ensure retention of his tenants coupled to sensible running and maintenance costs.

Leyford Construction

Design requirements: to provide comfort and information technology cooling for the Threselfords business park development for Leyford Construction. The projects ran over a 12 month period working closely with the architects, site owners and other trades involved to ensure quality and deadlines were met. During this high value project a verity of brands were used including Daikin, Mitsubishi Heavy and Electric, along with Panasonic, Toshiba and Hitachi  - depending on each end users personal preference after having several options.

LuCca Restaurant, Manningtree, Essex

Design requirements: to provide air conditioning within first floor dining area within a tight budget and without reducing the number of covers or making any area impractical. We installed two simple high wall AOYG 6kW air conditioning systems keeping all pipes and cables hidden. We worked closely with our client and managed to negotiate the issue raised by installing within a property of considerable age.

Ipswich Town Football Club

We were approached by the facilities manager and asked to assist with the cleaning of some old fan coils after becoming concerned about how they were being advised by existing provider. Climate reassured them that the remedial expensive works they had been advised to undertake were not necessary and there were many more options available to allow the systems to conform to ongoing legal requirements.

We were able to undertake the works without any major expense and make the club aware of the equipment’s limitations and their responsibilities under F gas legislation in the future. We have gone on to undertake any installations and enjoy a good working relationship with this valued customer.

Our Statistics in Essex & Suffolk

Fast and reliable air conditioning solutions for your business in Colchester and Ipswich areas. 

2154

AC Units Installed

489

Completed Projects

521

happy Customers!

Contact us

Phone

01206 615755

Location

Unit 6

Morside Business Park

Colchester

Essex

CO1 2ZF

Working hours

Flexible working hours - including Saturdays